CUBE

Paintexpo 2022 - E-Cube

Investment

Up to 24%* lower investment costs because no additional systems such as pump units, delivery stations or tanks are required.

energy cost

Up to 42%* lower energy costs because the system is completely dry and air recirculation /preparation is easier.

Operation

Easy operation: Filter change can be performed simply at the push of a button during operation.

     Standard-Cube process:      Paintshiop        →       Disposal

       Pyrolisis process:          Paintshop      →                  pyroltic cleaning   →    disposal of residues

Address

Eisenmann GmbH
Tübinger Straße 81
D-71032 Böblingen