Stay up to date
Eisenmann plans, designs and installs as general contractor
Pretreatment and cathodic dip coating form the foundation of the complex automotive painting process. Even at this early stage, minor details are decisive for a smooth production flow and high coating quality.
Thanks to numerous successfully completed complex projects, Eisenmann has extensive experience in optimally utilizing limited floor space in existing plant environments for the benefit of its customers. Against this background, the BMW Group commissioned the plant manufacturer to modernize the PT/ED system for axle carrier production at its Dingolfing site.
Within an existing production hall, Eisenmann implemented a pretreatment and cathodic dip coating system measuring 55 × 25 meters with a height of 9 meters.
Discover more about our solution and find out how the modern PT/ED system makes a significant contribution to increased efficiency and flexibility in response to changing production requirements.
Detailed information can be found in this article or video!