Main Content

Biogas Plants

Standardized Biogas Plants

250 kW biogas plant
Zoom
250 kW biogas plant
250 kW biogas plant

Eisenmann biogas plants are double digesters.
The primary digester is a plug flow digester with a continuous horizontal agitator shaft and the secondary digester is a stirred tank reactor. This design enables optimum fermentation of difficult substrates and those with high dry matter content.

Made-to-measure biogas plants can be developed by combining multiple primary digesters.

Advantages of the Eisenmann Biogas Plants

  • Standardized (Eisenmann has built more than 70 plants to date)
  • Short delivery times and extremely short construction times thanks to prefabricated components
  • Primary digesters with volumes of 270 and 325 m³
  • Plug flow process for high dry mass content up to 32% with a high and consistent gas output and high process stability
  • Agitator technology prevents scum forming
  • Settled sludge is removed
  • Easily extensible thanks to modular design
  • Primary digester features efficient wall heating using heating jackets, insulation and lining
  • Low footprint, low intrinsic power consumption
  • Can be dismantled at neutral cost thanks to the recycling value the steel components: primary digester, secondary fermenter and digestate storage

Contact

Contact person

Name

Bianca Hormann

Firm

EISENMANN Anlagenbau GmbH & Co. KG

Environmental Technology

Telephone

work T
+49 7031 78-2833
fax F
+49 7031 78-222833
Contact form

How can we help you? Write to us.

* Required

Call me back

Any questions? We will call you back.

* Required

References

Eisenmann has built more than 70 biogas plants to date, with an installed electric capacity in the range of 190 to 1,400 kW.

© 2012 EISENMANN AG